Chairman's XI-Women's Warm-Up Match vs South Africa Updates: Rain Washes Out Match in Bangalore


India are set to take on South Africa Women in a multi-format series comprising three ODIs (in Bengaluru), a one-off Test and three T20Is (all in Chennai). The tour is set to begin with a warm-up match between the Chairman's XI and the South African Women in Bangalore on Thursday.

Here's what Indian coach Amol Muzumdar told the Indian team ahead of this match

TEAMS:

Board Chairman's XI: Jemimah Rodrigues (c), Minnu Mani (vice-captain), Priya Punia, Shubha Satheesh, Kiran Navgire, Mannat Kashyap, Tanuja Kanwer, Priya Mishra, Sajeevan Sajana, Saima Thakor, Sayali Satghare, Uma Chetry (week), Shipra Giri (week), Shabnim Shakil, Shweta Sehrawat

South Africa Women: Laura Wolvaardt (c), Annerie Dercksen, Delmi Tucker (week), Anneke Bosch, Sune Luus, Marizanne Kapp, Nonkululeko Mlaba, Nadine de Klerk, Mieke De Ridder (week), Sinalo Jafta (week) , Tazmin Brits (week), Eliz Mari Marx, Masabata Klaas, Tumi Sekhukhune, Ayabonga Khaka

When does the practice match start?

The practice match will begin in Bengaluru on Thursday, June 13 at 1:30 p.m. IST.

Can the practice match be watched live?

There is no live stream available for this warm-up match.

LIVE UPDATES: MATCH SUMMARY

Draw: Chairman of the Board of Directors Xi Women won the draw and was elected to bat

Seventh finished: Priya Punia b Tumi Sekhukhune 25 (31b, 5×4) – Board Chairman's XI: 34/1

Tenth above: 46/1 – Shubha Satheesh and Shweta Sehrawat in the middle

Rain delay: Showers stopped play in Bengaluru: BPXI: 71/1 in 14 overs

Updated at 4:10 p.m.: The drizzle persists in Bangalore. Players reportedly walked onto the green twice but had to turn back. India elected to bat and made 71/1 in 14 overs before rain interrupted play. Dark clouds hovered over Chinnaswamy. I wonder if a recovery is possible with heavy showers hitting other parts of the city at the same time. Some time ago, the BCCI had made the revised terms public: Playback will resume at 3:35 p.m. IST; 47 overs per secondary match.; Powerplay: 9 overs for the 2nd innings – However, the game has not yet resumed

Updated at 4:40 p.m.: The rain has stopped.

Updated at 5:15 p.m.: The rain has started again in Bangalore and the covers are restored. It doesn't look good for this game.

Latest update: game canceled due to rain.

Leave a Reply

Your email address will not be published. Required fields are marked *